TailCheckN114KD
Free tail pageData current to 31 Jul 2026
Operational record · single airframe

N114KD · Gulfstream G550 flight activity

86 tracked flights in the 12 months to 31 Jul 2026, on about 5 days a month and an estimated 226 hours in the air.

See a sample report →

Last 12 months

How N114KD has been flying

N114KD flies about one and a half times as often as the middle GV, inside the 4 to 7 flights a month flown by the middle half of the fleet.

Flights, 12 months
86

Tracked by ADS-B, so a minimum.

Estimated hours, 12 months
≈226 hr

From time in the air. The logbook has the exact total.

Days flown a month
5.2 d

Against 3.9 d for the middle GV.

Last tracked
Jun 2026

Last tracked in June 2026. Published seven days later, by month only.

Month by month

86 flights over 10 active months

Flights per month · shaded band is the middle half of the fleet (3.5–7.3 a month)

8
7
11
19
5
–
6
2
8
7
13
–
A
S
O
N
D
J
F
M
A
M
J
J
20252026

N114KD flew more than the middle half of the fleet in 5 of 12 months. Its busiest month was November 2025, with 19 flights.

Its busiest month was November 2025, with 19 flights. It did not fly in January 2026. The record has 44 tracking gaps, so about one flight in 2 may be missing and every count is a minimum.

Chapter 04

Utilization

Typical than the type

How steadily it has been used: flights, flying days and estimated hours against the type.

Used about as much as most. Typical on utilization.

Used at about the rate of most of the fleet, so its maintenance intervals have been used up at a normal pace.

Flights a monthTypical
7.1

Against 5.0 for the middle GV (74th). Used like a typical Gulfstream GV.

Home baseContext
In the report

Share of flying days from one field.

The data behind it

Against all 638 tracked GVs, over its record since 1 Jan 2025.
DimensionBelowMedianAboveThis tailPctile
Flights a monthTypicalLead metric
In the months it flew
7.1
middle GV 5.0
74th
Days flown a monthTypical
Days with at least one flight
4.4 d
middle GV 3.9 d
60th
Estimated hours a yearTypical
From time in the air
≈214 hr
middle GV ≈149 hr
74th
Route shape only. No airports or dates named.

How it travels

Its flying is spread across many routes.

Most-flown pair
10%

9 of 86 flights, both directions.

Top three pairs
27%

Spread across many destinations.

International
21%

17 flights crossed a border.

N114KD’s flying is spread across many routes. Its most-flown pair of airports carries 10% of flights, 9 of 86, counting both directions. Its top three pairs make up 27%, so about seven flights in ten go somewhere else. Of its 86 tracked flights, 17 (21%) crossed a border.

Chapters 01–03

Fatigue, corrosion, engines and brakes

01 Fatigue

Close to the type

How short were its legs? Airframes age by landings as well as by hours. Many short legs put more pressurization cycles on the structure for the same time in the air.

Hours per landing Lead metric
Estimated flight hours per landing

N114KD is in here

middle GV 2.4 : 1
In the report

Also graded: short hops. Leg length is shown as context. See this chapter in the sample report →

02 Corrosion

Outside the middle of the fleet

Where does it spend its nights? Where a jet sleeps shapes how fast it corrodes. Salt and damp overnight are what an inspector looks at first.

Salt air Lead metric
Nights within 2 km of the coast, as a share of nights we can place

N114KD is out here, on one side or the other

middle GV 3%
In the report

Also graded: damp air, freeze–thaw, near the coast and moisture in the air. See this chapter in the sample report →

03 Engines and brakes

Close to the type

How hard were its airfields? Short, hot and high runways ask for more thrust on every takeoff and harder braking on every landing. That wear doesn’t show in the hours.

Short runways Lead metric
Departures where the longest runway was under 1.25× the takeoff distance

N114KD is in here

middle GV 32%
In the report

Also graded: hot, high takeoffs; density altitude; dust and dry climate. See this chapter in the sample report →

TailCheck report

What the full report adds for N114KD

  1. 01 All four chapters graded, with the evidence behind every grade
  2. 02 The operational summary: the whole aircraft in one read
  3. 03 Its longest stay away from base, and what the record does and doesn’t show about it
  4. 04 Its home base pattern and operating rhythm: busiest days and months
  5. 05 PDF, CSV and a share link

Open the sample report →

$395 for N114KD, one payment

A fraction of the cost of a pre-buy inspection, before you book one.

Peers

Other GVs

Tails flown at a similar rate, with their tracked flights in the 12 months to 31 Jul 2026. Each has its own free page.

TailFlights, 12 monthsEstimated hours a year
N549CF99≈215
LV-KLH94≈428
N550GA75≈238
N513MA96≈202
N785QS72≈192
Questions

About N114KD

How many hours does N114KD fly a year?

About 226 estimated hours in the 12 months to 31 Jul 2026, across 86 tracked flights. Hours are estimated from time in the air, so the logbook has the exact figure.

How often is N114KD flown?

N114KD made 86 tracked flights in the 12 months to 31 Jul 2026, about 7 a month, and flew on about 5 days in each month it flew.

Does N114KD fly internationally?

17 of its 86 tracked flights in the 12 months to 31 Jul 2026, 21%, crossed a border.

When did N114KD last fly?

It was last tracked in June 2026. We publish an aircraft’s flights seven days after they happen, and show them by month only.

Why don’t you show which airports N114KD uses?

We leave out airports, bases and exact dates on purpose. We show how an aircraft has been used, not where it goes.

What’s in the full TailCheck report for N114KD?

All four graded chapters (Fatigue, Corrosion, Engines and brakes, and Utilization), each against the tracked GVs, plus the operational summary and operating rhythm, as a PDF, CSV and share link. It costs $395, or $995 a month for unlimited reports and Spotlight.

Method

How this page is made

Everything here comes from N114KD’s ADS-B track, the position signal aircraft broadcast, over the 12 months to 31 Jul 2026. ADS-B misses some flights, so every count is a minimum. Flights appear seven days after they happen, by month only, and hours are estimated from time in the air; the logbook has the real totals. Airports, bases and exact dates are left out on purpose. How grades work: each graded measure is placed among the tracked GVs against the middle aircraft, the 50th percentile. Between the 25th and 75th it is typical; outside that band it is gentler or harsher. Utilization is graded here for free; for the other chapters this page shows the middle value of the fleet and whether this aircraft sits inside the middle half or outside it. Their grades and values are in the report, not on this page. Owners and operators can ask us not to publish an aircraft’s activity.

Data policy and opt-out →